13 XCMG Rotary Drills Speed up the “One Hour Circle” in the Great Bay Area

2022-11-08 11:49:05

 




In Guangzhan high-speed railway Yangjiang North Station, 13 XCMG rotary drilling rigs assemble into the site. Two of the XCMG XR400D demonstrate their strength during construction. The monthly output value is up to 3 million thanks to their excellent performance and high efficiency.

 



With the total length of 400 kilometers and the total investment of 99.8 billion yuan, the main line of Guangzhan high-speed railway is an important part of the national high-speed railway network of the "eight vertical and eight horizontal". It plays an essential role in the development of “land and sea outreach” and “east and west integration” in Guangdong.

 

XCMG rotary drilling rigs participate in the construction of the Yangjiang North Station Project, which connects the Guangdong-Hong Kong-Macao Great Bay Area and Hainan Free Trade Zone.

 

Facing the engineering challenge of slightly weathered granite, the two XCMG XR400D rotary drilling rigs show their mighty construction strength. The pile depth is 40-50 meters and the pile diameter is 1.2-1.6 meters. The drilling rigs attract special attention from the project department by helping customers complete an output value of more than 3 million yuan in a month. Not only fast but also quality-guaranteed.


 



So far, 93% of all rotary drilling rigs along the Yangjiang North Station project of Guangzhan High-speed Railway are from XCMG. There are 13 XCMG XR360, XR360E and XR400D rotary drilling rigs on site now. Golden pillars stand between the sky and the clouds. They are pulling, drilling and spinning, accelerating the completion of the project.

 

Around 2000 piles are expected to be installed in Yangjiang North Station project. XCMG's 13 rotary drilling rigs are giving full play to strong kinetic energy and are making great contributions to the completion of the whole project by installing 3 piles every 2 days.


As pile foundations going deep into the ground, the piers and columns standing high, the construction of the Yangjiang North Station project of Guangzhan High-Speed Railway began to accelerate. We will be able to have breakfast in Guangzhou, watch the sea in Yangjiang at noon, and have dinner in Zhanjiang at dusk by then. The “one-hour circle” in the Great Bay Area will come true!





Share
Recommended
Why is XCMG Large-tonnage Clamp So popular in Port Construction Site?
2024-04-24
Do you know who is the best partner in mining construction?
2024-04-22
XCMG DTH Drilling Rig Departs South America!
2024-04-17
Three XCMG 20-ton Excavators, which one will you choose?
2024-04-15
How to choose a second-hand loader correctly?
2024-04-10