.jpg.webp_l.webp)
Gaodetec GM2000 Clc Block Foam Concrete Block Making Production Line

.jpg.webp)

Specifications
- Weight:1500.000kg
- Capacity:20-30m3/h
- Power:30Kw
- Voltage:3 phase, 380V, 50Hz
- Mixer volume:2000L
- Foam generator:30m3/h
- Measurement method:Cumulative measurement
- Main part dimension:4000*2050*1900mm
- Weight:1500kg
Packaging & Shipping
- Delivery Lead Time:7 days for ready goods
- Minimum Order:1 Piece
- Supply Ability:10,000 Set/ Sets per Month
- Total Quantity In Stock:Over 5000
- Delivery Port:Any Port In China
Product Description
_1753865373052.jpg.webp)
_1753865388823.jpg.webp)
Main Features
1. Control system: concentrated control, easy to operate.
2. Mixer tank: bigger capacity 2000L, each batch can produce large quantity foam concrete, more efficiency._1753865428696.jpg.webp)
Technical Parameter
Product Display
Application
Foam concrete machine applications: 1. External wall thermal insulation 2. Thermal insulation roofing 3. Thermal flooring 4. Upstandingbeam foundation ditches filling 5. Sound insulation and fire protection walls 6. Playground and track construction 7. Sound insulation layer, tunnel lining filling 8. Cellar, basement and arch filling 9. Sewers and Drains filling 10. Horizontal floor heightening 11. Water tank and fuel tank building 12. Platform filling and mending 13. Garden and rockeries 14. Foam concrete block 15. Foamed concrete precasting, hollow wallboard casting
FAQ
1. Are you the manufacturer or a trade company?
We are the manufacturer for producing grout equipment.
And we have owned a trading company to do International Business,
So that:
1)-We can supply good service with professional international trade experience.
2)-The price is much more competitive.
2. Can you do the ODM or OEM? What is MOQ?
Yes, it is possible as discussed, MOQ: 1unit.
3. What about delivery time? How long can I get the machine after the order?
The production time is as fast as 30-60 working days if you customize the machine.
The standard machine in stock can be delivered as soon as possible after ordering.
4. How to pay for yourself?
50% down payment, then production starts, and the balance 50% paid before shipping.
If the machines are in stock, pay 100% then delivery.
Our Advantages

