_1752547104362.jpg.webp_l.webp)
Gaodetec GGH75/100 PI-E cement injection piston pump

_1752547104362.jpg.webp)

GGH75/100 PI-E
Specs & Compare
Details
Specifications
- Weight:390.000kg
- Type:GGH75/100 PI-E
- Adjustable pressure ( low pressure)Capacity:0-50Bar/725psi
- Adjustable flow rate( low pressure):0-75L/min
- Adjustable pressure ( high pressure):0-100Bar/1450psi
- Adjustable flow rate ( high pressure):0-40L/min
Packaging & Shipping
- Delivery Lead Time:7 days for ready goods
- Minimum Order:1 Piece
- Supply Ability:10,000 Set/ Sets per Month
- Total Quantity In Stock:Over 5000
- Delivery Port:Any Port In China
Description
The GGH75/100 PI-E cement injection piston pump is designed and made for various grouting methods, including permeation grouting, compaction grouting, backfilling grouting, curtain grouting, and high-pressure split grouting.
Grouting material: cement mixture, mortar/plaster, bentonite, and other additives.
.JPG.webp)
_1752547104751.jpg.webp)
Parameters
_1752547104114.jpg.webp)
Details
_1752547108629.jpg.webp)
_1752547105149.jpg.webp)
Application
1. Civil Engineering - dam foundations, tunnels, mining, soil nails, tiebacks, earth anchors, cable and rock bolts
2. Structural – building and bridge restoration, foundation stabilization, foundation raising, soil compaction grouting; soil & rock grouting
3. Construction - pavement under sealing, slab jacking and slab raising
4. Marine - underwater foundations, piers, breakers, shoreline foundations
5. Mining - tunnel lining, contact grouting, shaft waterproofing
6. Utilities - encasements, waterproofing, slope line grouting
7. Geotechnical - deep well casing, monitor wells, well sealing and abandonment

FAQ
1. Are you the manufacturer or a trade company?
We are the manufacturer for producing grout equipment.
And we have owned a trading company to do International Business,
So that:
1) We can supply good service with professional international trade experience.
2) The price is much more competitive.
2. Can you do the ODM or OEM? What is MOQ?
Yes, it is possible as discussed, MOQ: 1unit.
3. What about delivery time? How long can I get the machine after the order?
The production time is as fast as 30-60 working days if you customize the machine.
The standard machine in stock can be delivered as soon as possible after ordering.
4. How to pay for yourself?
50% down payment, then production starts, and the balance 50% paid before shipping.
If the machines are in stock, pay 100% then delivery.
Our Advantages
Packaging and Delivery





Contact Supplier
1. What is the project you are going to do?
2. What flow and pressure do you demand?
3. What's the water-cement ratio of the material you will mix and grout?
4. Regarding the engine, would you like an electric motor or a diesel engine? if electric motor, 3 phase, 380v, 50HZ is ok for you?


Add a Product
1 selected
Confirm